Document Version: 1.0 Date: August 8, 2025 Author: CrownThrive, LLC — [email protected] Project: CHLOM™ — Compliance Hybrid Licensing & Ownership Model
1. Objective
Provide an extremely high-level testing and deployment framework for the Decentralized Licensing Authority (DLA) under the TLAAS protocol, ensuring functional stability, compliance accuracy, and secure delivery into production environments.
2. Testing Goals
- Functional Validation — Ensure all smart contract methods work as intended.
- Compliance Integrity — Validate rule enforcement and jurisdiction mapping.
- Performance Benchmarking — Test under stress and high transaction volume.
- Security Hardening — Identify and mitigate vulnerabilities.
- DAO Governance Testing — Simulate governance actions and outcomes.
3. Testing Stages
- Unit Testing — Validate each function with deterministic inputs.
- Integration Testing — Test interactions between DLA, DAL, LEX, and Compliance AI.
- Security Audits — Internal and third-party audits for vulnerabilities.
- Load Testing — Simulate high transaction throughput.
- User Acceptance Testing (UAT) — Involve governance participants before launch.
4. Deployment Pipeline
- Staging Environment — Full DLA replica on a testnet with simulated governance.
- Continuous Integration (CI) — Automated builds, tests, and lint checks.
- Continuous Deployment (CD) — Secure, version-controlled deployments.
- Multi-Sig Approval — Required before mainnet deployment.
5. Rollback Procedures
- Smart Contract Versioning — Maintain previous stable versions.
- Automated Revert Scripts — Roll back to prior state in case of deployment failure.
- Incident Reports — Required for governance review post-rollback.
6. Example CI/CD Workflow
stages:
- build
- test
- audit
- deploy
build:
script: npm install
test:
script: npm run test
audit:
script: npm run security-audit
deploy:
script: npm run deploy:mainnet
when: manual
only:
- tags
7. Security Considerations for Developers
- Sign all deployments with verified keys.
- Require multi-party sign-off for governance-sensitive updates.
- Maintain immutable deployment logs on the CHLOM Ledger.
8. Phase Roadmap for Development
- Phase 0 — Define QA strategy, staging workflows, and rollback plans.
- Phase 1 — Implement CI/CD pipeline for testnet.
- Phase 2 — Conduct full security and compliance audits.
- Phase 3 — Deploy with DAO oversight to production.
- Phase 4 — Post-deployment monitoring and optimization.
- Phase 5 — Establish long-term automated governance-based updates.
Next Developer Task: Proceed to Phase 4–5 Launch Plan & Governance Transition for DLA — finalize DAO control migration, multi-chain expansion, and scaling strategy.